I'm saying the results will be so uneven that you'll have long sections that aren't developed at all. A five-gallon bucket will do garbage can development of 100 ft of 16mm well enough that, although it'll be severely uneven, it'll at least be developed all the way through. Folks used to do motion analysis films that way. --scott